Flow State Estimating Request a takeoff

Construction and HVAC takeoff services for US and Canadian contractors, counted by people who have installed it.

Quantity takeoffs for air balancing, HVAC, mechanical and general construction bids, with every count checked against the schedules. Count takeoffs start at $245 for up to 10 sheets, delivered in 3 to 7 business days.

Takeoff summary, M-seriesExample layout
TagItemSizeQtyChecked
SD-1Supply diffuser24x2486✓
RG-1Return grille24x1241✓
VAVVAV box with reheat8 in22✓
FDFire dampervaries34✓
DUCTRectangular supply duct24x121,024 LF✓
DUCTRound spiral duct10 in460 LF✓
FLEXFlexible duct8 in310 LF✓
Your takeoff follows the tags on your drawings and can be laid out in your own template.

Takeoff services by trade

Mechanical and HVAC takeoffs are the core of our construction takeoff services. General construction scopes are counted the same way: by sheet, by tag, with nothing guessed.

  • Ductwork takeoff

    Duct lengths by size, fittings, dampers, insulation and liner.

  • Air devices for TAB

    Every supply, return and exhaust outlet, counted by tag and checked against the schedule.

  • HVAC equipment

    RTUs, AHUs, fans, VAV boxes, heaters, checked against the schedules.

  • Mechanical piping

    Hydronic, refrigerant, gas and domestic runs, with valves and fittings.

  • Plumbing fixtures

    Fixtures, drains, cleanouts and trim, by type and location.

  • Fire protection

    Sprinkler heads by type, mains, branch lines and risers.

  • Electrical

    Devices, light fixtures, panels and equipment connections.

  • Drywall and framing takeoff

    Wall types by length and height, ceilings, bulkheads and openings.

Need something that isn't listed? Describe it in the request and we'll tell you if we can count it. Also see construction estimating services and quantity takeoff services.

What every takeoff includes

This is what a count takeoff (air devices and equipment) contains. Measured trades are delivered in Excel by item, size and unit.

  • Excel workbook

    Summary, Takeoff, Evidence, By category, Scope flags and Sheet index tabs, ready to paste into your estimate.

  • Every line by tag

    Each line shows the tag, description, schedule quantity, plan count and the final quantity.

  • Evidence sheet

    The sheet, page and location of every counted item, so any number can be checked in seconds.

  • Schedule vs plan reconciliation

    Each line is GREEN when the schedule and the plans agree, YELLOW when they differ a little, RED when they do not match.

  • Scope flags and open questions

    Notes such as an addendum referenced, equipment to be replaced or existing work to remain, worth raising as RFIs before you bid.

  • Reviewed by a person

    The file stays marked DRAFT until every red line has been reviewed. A person reviews every takeoff before delivery.

A PDF summary report comes with the workbook. See a sample takeoff.

How it works

  1. Send your drawings

    Use the request form or email a link to the set. PDF drawings, schedules, specs and addenda.

  2. We reply with a fixed quote

    A fixed price and delivery window for the scope you asked for, usually within 1 business day.

  3. Accept and pay in full

    Pay by card payment link, or by Interac e-Transfer in Canada. Payment is in full, before work starts.

  4. Work starts

    The clock starts when payment is received. Questions about the drawings come to you by email.

  5. Delivery in 3 to 7 business days

    Depending on sheet count and scope. A person reviews every takeoff before it is sent.

Field experience, not just software

Your takeoff is prepared by trained professionals with real in-field experience in HVAC and construction. People who have installed the work know what the drawings are asking for, and it shows in the count.

  • 25+ years in HVAC, construction and quality inspection
  • Every count checked against the schedules and specs
  • Written notes on anything the drawings leave unclear

Pricing

  • Count takeoff (air devices and equipment, for TAB and HVAC): from $245 up to 10 sheets, then $20 per sheet.
  • Measured trade takeoff (duct, piping, plumbing, electrical, drywall): from $325 per trade up to 6 sheets, then $52 per sheet.
  • Takeoff plus pricing with your own rates: from +$195.
  • Firms sending 10 or more jobs a month: monthly plans, ask.

Turnaround is 3 to 7 business days from payment. Emergency turnaround on request when capacity allows: $150 or 50% of the takeoff price, whichever is more.

We take a limited number of takeoffs each week.

Questions estimators ask

How much do takeoff services cost?

Count takeoffs of air devices and equipment start at $245 USD for up to 10 sheets, then $20 per sheet. Measured trade takeoffs start at $325 per trade for up to 6 sheets, then $52 per sheet. Every job gets a fixed quote before any work starts.

How fast is the turnaround?

3 to 7 business days depending on sheet count and scope, counted from when payment is received. Emergency turnaround is available on request when capacity allows: $150 or 50% of the takeoff price, whichever is more.

When do I pay?

In full, after you accept the quote and before work starts. Pay by card through a payment link, or by Interac e-Transfer in Canada.

What is the difference between a takeoff and an estimate?

A quantity takeoff is the count and measure: how many diffusers, how many feet of duct by size, how many fixtures. An estimate adds pricing, labor and markup. We deliver the takeoff so your estimator can build the estimate, or apply your own rates as an add-on.

Which trades do you take off?

Mechanical and HVAC is the core, including air devices and equipment for air balancing, ductwork and piping. We also take off plumbing, fire protection, electrical, and drywall and framing.

Where are you located, and do you work in my state?

Flow State Estimating is based in Ontario, Canada and works remotely. Drawings are sent digitally, so we take on projects anywhere in the United States and Canada.

Do you work in imperial or metric?

Either. Quantities follow the units on your drawings.

What format will the takeoff come in?

Excel, with a PDF summary report for count takeoffs, or laid out in your own template if you upload it with the request. Quantities are organized by sheet, system and tag.

Are my drawings kept confidential?

Your documents are used only to prepare your takeoff and aren't shared with anyone else.

Request a takeoff

The more we know about the job, the faster the quote. Fields marked optional can be left blank.

Contact
Preferred contact method
Project
Construction type
Trades and scopes needed Tick all that apply
Leave blank if you're flexible before the bid date.
Documents PDF preferred. Uploads up to 95 MB in total; use a link for larger sets.
Dropbox, Google Drive, OneDrive or a plan room link. Best for sets over 95 MB. Make sure it's set so we can view it.

No drawings yet? Send the request anyway and email them to [email protected] later.

Output
Output format

We reply by email with scope questions or a fixed quote, usually within 1 business day. Payment is in full after you accept the quote, before work starts. Your documents are used only to prepare your takeoff.

How we handle your drawings and details: privacy.

Prefer email?

Copy this template into an email to [email protected], fill it in and include a link to the drawings if you have them. AI assistants can use the same template.

Subject: Takeoff request - <project name>
Name:
Company:
Email:
Phone:
Project name:
Project location (city, state or province):
Project type:
Construction type (new, renovation, tenant fit-out):
Scopes (HVAC ductwork, HVAC equipment, air devices for TAB, plumbing, fire protection, electrical, drywall and framing, other):
Items to count:
Bid due date:
Takeoff needed by:
Drawings link (optional, can be sent later):
Output format (Excel, CSV, my template):
Notes:
How did you find us:
I have the right to share these documents: yes