Quantity takeoff services
We take off the quantities your bid depends on, from your PDF drawings, and show you where every counted item is. Count takeoffs start at $245 for up to 10 sheets, measured trades at $325 per trade, in Excel within 3 to 7 business days.
Two kinds of quantity takeoff
Count takeoffs
A count takeoff lists every tagged item on the drawings: air devices, terminal units, fans, rooftop units, air handlers, fan coils and heat pumps. Each item is located on the plans by our takeoff engine, compared with the schedules, and reviewed by a person. This is our lead product: it is fast, it is checkable, and it starts at $245 for up to 10 sheets.
Measured takeoffs
A measured takeoff is lengths and areas: duct by size, pipe by diameter and material, conduit and wire runs, wall types by length and height. These are measured in Bluebeam by an estimator and quoted per job, starting at $325 per trade for up to 6 sheets.
| Trade | Type | Starting price (USD) |
|---|---|---|
| Air devices and equipment for TAB | Count | $245 up to 10 sheets, then $20 per sheet |
| HVAC equipment and air devices | Count | $245 up to 10 sheets, then $20 per sheet |
| Ductwork by size and length | Measured | $325 up to 6 sheets, then $52 per sheet |
| Mechanical piping | Measured | $325 up to 6 sheets, then $52 per sheet |
| Plumbing | Measured | $325 up to 6 sheets, then $52 per sheet |
| Electrical | Measured | $325 up to 6 sheets, then $52 per sheet |
| Drywall and framing | Measured | $325 up to 6 sheets, then $52 per sheet |
What every takeoff includes
This is what a count takeoff (air devices and equipment) contains. Measured trades are delivered in Excel by item, size and unit.
Excel workbook
Summary, Takeoff, Evidence, By category, Scope flags and Sheet index tabs, ready to paste into your estimate.
Every line by tag
Each line shows the tag, description, schedule quantity, plan count and the final quantity.
Evidence sheet
The sheet, page and location of every counted item, so any number can be checked in seconds.
Schedule vs plan reconciliation
Each line is GREEN when the schedule and the plans agree, YELLOW when they differ a little, RED when they do not match.
Scope flags and open questions
Notes such as an addendum referenced, equipment to be replaced or existing work to remain, worth raising as RFIs before you bid.
Reviewed by a person
The file stays marked DRAFT until every red line has been reviewed. A person reviews every takeoff before delivery.
A PDF summary report comes with the workbook. See a sample takeoff.
How to tell if a quantity takeoff is any good
Before you pay anyone for a takeoff, ask what you will be able to check. A good quantity takeoff lets you answer these questions without recounting:
- Where on the drawings did each number come from?
- Does the plan count agree with the schedule, and if not, why?
- Which notes on the drawings change the scope?
- What was left out, and what was assumed?
- Has a person looked at it, or is it raw software output?
Our count takeoffs answer the first four in the workbook itself: the Evidence sheet, the GREEN, YELLOW and RED status with its reason, the Scope flags sheet, and written notes on assumptions. The fifth is simple: a person reviews every takeoff before it is delivered, and the file says DRAFT until that review is done. You can check all of this on the sample takeoff before you send a job.
Takeoff only, or priced
What to send with the request
The faster we can see the whole scope, the faster the quote. Send the drawings for your trade as PDF, including the schedules, details and legend sheets, the spec sections for your trade, and every addendum issued so far. If the set is larger than 95 MB, paste a Dropbox, Google Drive, OneDrive or plan room link instead of uploading. Tell us the items you want counted or measured and your bid due date. If you already have a takeoff template, upload it and we will fill it in rather than sending our own format.
Most clients want quantities only and price them with their own system. If you want a priced sheet, send your unit costs, labor units and markup and we apply them, from +$195. We do not use a generic price database.
Pricing
- Count takeoff (air devices and equipment, for TAB and HVAC): from $245 up to 10 sheets, then $20 per sheet.
- Measured trade takeoff (duct, piping, plumbing, electrical, drywall): from $325 per trade up to 6 sheets, then $52 per sheet.
- Takeoff plus pricing with your own rates: from +$195.
Turnaround is 3 to 7 business days from payment. Emergency turnaround on request when capacity allows: $150 or 50% of the takeoff price, whichever is more.
How it works
Send your drawings
Use the request form or email a link to the set. PDF drawings, schedules, specs and addenda.
We reply with a fixed quote
A fixed price and delivery window for the scope you asked for, usually within 1 business day.
Accept and pay in full
Pay by card payment link, or by Interac e-Transfer in Canada. Payment is in full, before work starts.
Work starts
The clock starts when payment is received. Questions about the drawings come to you by email.
Delivery in 3 to 7 business days
Depending on sheet count and scope. A person reviews every takeoff before it is sent.
Quantity takeoff questions
What is a quantity takeoff?
A list of every item and quantity a bid has to price, taken from the drawings: counts of tagged items such as diffusers and fixtures, and lengths or areas such as duct, pipe and wall. It does not include prices.
How much do quantity takeoff services cost?
Count takeoffs start at $245 USD for up to 10 sheets, then $20 per sheet. Measured trade takeoffs start at $325 per trade for up to 6 sheets, then $52 per sheet.
How do you check a quantity takeoff?
Every count is compared with the schedules and marked GREEN, YELLOW or RED. The Evidence sheet lists the sheet, page and location of every counted item, and a person reviews every takeoff before delivery.
What format do I get?
Excel, with a PDF summary report for count takeoffs. If you upload your own template, the quantities are laid out in it.
What do you need from me?
The drawings as PDF, the spec sections for your trade and any addenda. For large sets, a Dropbox, Google Drive, OneDrive or plan room link works.
Do you work in metric?
Yes. Quantities follow the units on your drawings, imperial or metric.
Are my drawings kept confidential?
Your documents are used only to prepare your takeoff and are not shared with anyone else.
Request a takeoff
Send the drawings and the scope. You get a fixed quote, usually within 1 business day, and nothing starts until you accept it and pay.