Electrical estimating services
We take off light fixtures, devices, panels and equipment connections from your electrical drawings and reconcile them with the fixture and panel schedules. Electrical takeoffs start at $325 for up to 6 sheets, then $52 per sheet, in Excel within 3 to 7 business days.
| Tag | Item | Size | Qty | Checked |
|---|---|---|---|---|
| A | Light fixture, 2x4 LED | 142 | ✓ | |
| B | Downlight | 6 in | 64 | ✓ |
| EX | Exit sign | 18 | ✓ | |
| REC | Duplex receptacle | 20A | 236 | ✓ |
| SW | Switch, single pole | 58 | ✓ | |
| PNL | Panelboard | sched. | 6 | ✓ |
| FA | Fire alarm device | varies | 47 | ✓ |
What an electrical takeoff includes
Counts follow the fixture schedule, panel schedules and symbol legend on your electrical drawings.
Lighting
Light fixtures by type from the fixture schedule, plus exit and emergency lighting.
Wiring devices
Receptacles, switches, data outlets and floor boxes, counted by type.
Panels and distribution
Panelboards, transformers, disconnects and switchgear from the one-line diagram.
Equipment connections
Connections for mechanical equipment, motors and kitchen equipment, from the schedules.
Low voltage and fire alarm
Fire alarm, security and communications devices by type.
Feeders and conduit
Feeder runs and conduit measured where they are drawn or scheduled.
What you get with a electrical takeoff
Electrical takeoffs are measured in Bluebeam by an estimator and quoted per job.
Excel by item, size and unit
Every line has the item, the size or type, the quantity and the unit, ready to paste into your estimate or your own template.
Measured in Bluebeam by an estimator
Lengths and areas are measured by hand in Bluebeam by an estimator, not guessed from a rule of thumb. You also get the Bluebeam markup PDF, so you can see what was measured on each sheet.
Counts checked against the schedules
Scheduled items are counted on the plans and compared with the schedule, and differences are noted.
Organized the way you price
By floor, area, system or phase. Tell us in the request and the takeoff is grouped that way.
Notes on assumptions and open questions
Anything the drawings leave unclear is written down, so you can raise it as an RFI or carry an allowance.
Reviewed by a person
Every takeoff is reviewed by a person before delivery.
Count takeoffs of air devices and equipment also come with an Evidence sheet and GREEN, YELLOW and RED reconciliation. See a sample takeoff.
Electrical takeoffs counted against the schedules
Electrical estimating depends on an accurate count of what's on the drawings. We take off fixtures, devices and distribution equipment sheet by sheet and reconcile the totals with the fixture and panel schedules.
Anything that doesn't reconcile comes back to you as a note. The electrical takeoff arrives in Excel, ready for your estimator to apply pricing and labor units.
How an electrical takeoff is put together
Lighting
Light fixtures are counted by type from the reflected ceiling plans and lighting plans and compared with the fixture schedule. Exit and emergency lighting are counted separately, because they are often priced separately.
Devices
Receptacles, switches, data outlets and floor boxes are counted by type from the power and systems plans, following the symbol legend on your drawings.
Distribution and connections
Panelboards, transformers, disconnects and switchgear come from the one-line diagram and the panel schedules. Equipment connections come from the mechanical and kitchen equipment schedules, so a motor on the mechanical sheets is not missed on the electrical side.
Feeders and conduit
Feeder runs and conduit are measured in Bluebeam by an estimator where they are drawn or scheduled. Branch circuit lengths are usually not drawn; if you need them estimated, say so in the request and the quote will confirm the approach.
Common electrical takeoff requests
- A lighting fixture count by type for a fixture package or a lighting supplier quote.
- A device count for a tenant fit-out, split by floor or by tenant area.
- Fire alarm and low voltage devices by type for a systems sub.
- The full electrical scope for an electrical contractor's bid, with distribution and connections.
- Equipment connections only, taken from the mechanical schedules, to check a mechanical sub's coordination.
What to send
The electrical drawings as PDFs with fixture and panel schedules and the one-line diagram, plus the electrical spec sections and any addenda. If the mechanical equipment schedule matters for connections, include it.
Pricing
- Measured trade takeoff (duct, piping, plumbing, electrical, drywall): from $325 per trade up to 6 sheets, then $52 per sheet.
- Takeoff plus pricing with your own rates: from +$195.
- Firms sending 10 or more jobs a month: monthly plans, ask.
Turnaround is 3 to 7 business days from payment. Emergency turnaround on request when capacity allows: $150 or 50% of the takeoff price, whichever is more.
How it works
Send your drawings
Use the request form or email a link to the set. PDF drawings, schedules, specs and addenda.
We reply with a fixed quote
A fixed price and delivery window for the scope you asked for, usually within 1 business day.
Accept and pay in full
Pay by card payment link, or by Interac e-Transfer in Canada. Payment is in full, before work starts.
Work starts
The clock starts when payment is received. Questions about the drawings come to you by email.
Delivery in 3 to 7 business days
Depending on sheet count and scope. A person reviews every takeoff before it is sent.
Electrical estimating questions
Is this a priced electrical estimate?
Not by default. We deliver the electrical takeoff, and your estimator applies material pricing, labor units and markup. If you want a priced sheet, we apply your own rates as an add-on from +$195.
How much does an electrical takeoff cost?
An electrical takeoff is a measured trade takeoff, from $325 USD for up to 6 sheets, then $52 per sheet. You get a fixed quote before any work starts.
Do you measure branch wiring?
Feeders and conduit runs are measured where they are shown on the drawings. If you need branch circuit lengths estimated, say so in the request and the quote will confirm the approach.
What is included in an electrical takeoff?
Light fixtures, wiring devices, panels and distribution equipment, equipment connections, low voltage and fire alarm devices, and feeders or conduit where drawn.
Do you check fixture counts against the fixture schedule?
Yes. Fixtures are counted by type on the plans and compared with the fixture schedule. Anything that does not reconcile comes back as a note.
What do you need to start?
The electrical drawings as PDFs with fixture and panel schedules and the one-line diagram, plus the electrical spec sections and any addenda.
How long does an electrical takeoff take?
3 to 7 business days depending on sheet count and scope, counted from when payment is received.