Flow State Estimating Request a takeoff

Takeoff and estimating services for Canadian contractors

We prepare quantity takeoffs for contractors across Canada, from Ontario, billed in Canadian dollars. Count takeoffs start at $345 CAD for up to 10 sheets and measured trades at $455 CAD per trade, delivered in 3 to 7 business days from payment.

Request a takeoff CAD. Interac e-Transfer or card.

Prices in Canadian dollars

Takeoff prices for Canadian clients, CAD
ServiceStarting price (CAD)IncludesEach extra sheet
Count takeoff: air devices and equipment, for TAB and HVAC$345Up to 10 sheets$28
Measured trade takeoff: duct, piping, plumbing, electrical, drywall$455 per tradeUp to 6 sheets$73
Takeoff plus pricing with your own ratesfrom +$275Added to any takeoffn/a
Emergency turnaround50% of the takeoff, minimum $210When capacity allowsn/a
Monthly plan, 10 or more jobs a monthAskQuoted per firmn/a

Example: a 12-sheet office fit-out, air devices and equipment for a TAB bid, is $345 plus 2 sheets at $28, so $401 CAD. A 10-sheet ductwork takeoff is $455 plus 4 sheets at $73, so $747 CAD.

Payment is in full after you accept the quote and before work starts, by card payment link or Interac e-Transfer. Turnaround is 3 to 7 business days from payment.

Addenda issued before work starts are included in the takeoff. If an addendum is issued after delivery, we re-run it as a change: the affected sheets are charged at the per-sheet rate above, with a minimum of $105 CAD.

For Canadian contractors

Flow State Estimating is based in Ontario and works with contractors across Canada: mechanical and HVAC contractors, air balancing (TAB) firms, general contractors and small trades in Ontario, Quebec, Alberta, British Columbia and the rest of the country.

Metric and imperial

Canadian drawings mix units. Airflow is usually in L/s, duct sizes may be in millimetres or inches, and older buildings being renovated are often in imperial. The takeoff follows the units on your drawings and does not convert unless you ask.

Spec numbering

Some Canadian specs still use the older Division 15 numbering for mechanical work. Every category in the takeoff is mapped to both the Division 23 section and the Division 15 number, so the By category sheet lines up with whichever spec you have.

Codes

A takeoff counts and measures what is drawn and specified. It does not check the design against the National Building Code of Canada, provincial codes or CSA standards. Where a note on the drawings refers to them in a way that changes scope, it appears on the Scope flags sheet.

English or French drawings

Drawings in English or French are accepted, in metric or imperial units. Tags, sizes and units in the takeoff are kept as they appear on the drawings.

What every takeoff includes

This is what a count takeoff (air devices and equipment) contains. Measured trades are delivered in Excel by item, size and unit.

  • Excel workbook

    Summary, Takeoff, Evidence, By category, Scope flags and Sheet index tabs, ready to paste into your estimate.

  • Every line by tag

    Each line shows the tag, description, schedule quantity, plan count and the final quantity.

  • Evidence sheet

    The sheet, page and location of every counted item, so any number can be checked in seconds.

  • Schedule vs plan reconciliation

    Each line is GREEN when the schedule and the plans agree, YELLOW when they differ a little, RED when they do not match.

  • Scope flags and open questions

    Notes such as an addendum referenced, equipment to be replaced or existing work to remain, worth raising as RFIs before you bid.

  • Reviewed by a person

    The file stays marked DRAFT until every red line has been reviewed. A person reviews every takeoff before delivery.

A PDF summary report comes with the workbook. See a sample takeoff.

Air balancing takeoffs in Canada

Air balancing firms need a count of every outlet, terminal unit and piece of equipment, and they need to know when the schedule and the drawings do not agree. That is what our count takeoff does: devices are counted on the plans, compared with the schedules, and every line is marked GREEN, YELLOW or RED with a reason. See takeoffs for air balancing (TAB) contractors for the details.

Other trades

Measured scopes (duct, piping, plumbing, electrical, drywall and framing) are measured in Bluebeam by an estimator and quoted per job, in CAD. See the trade pages for what each one includes: HVAC, mechanical and MEP, plumbing, electrical and drywall and framing. Prices on those pages are in USD; Canadian clients pay the CAD prices above.

Why Canadian firms outsource takeoffs

Bid periods on Canadian public work are short, and the same few estimators carry most of the load in a mid-sized mechanical or TAB firm. Sending the counting out frees them to price, chase suppliers and sort out scope. Because we are in the same time zones as most Canadian contractors and bill in CAD, there is no currency surprise on the invoice and questions about the drawings get answered the same day.

Payment by Interac e-Transfer

Once you accept the quote, you get payment details by email. Canadian clients can pay by Interac e-Transfer or by card through a payment link. Work starts when the payment is received, and the 3 to 7 business day turnaround counts from then.

How it works

  1. Send your drawings

    Use the request form or email a link to the set. PDF drawings, schedules, specs and addenda.

  2. We reply with a fixed quote

    A fixed price and delivery window for the scope you asked for, usually within 1 business day.

  3. Accept and pay in full

    Pay by card payment link, or by Interac e-Transfer in Canada. Payment is in full, before work starts.

  4. Work starts

    The clock starts when payment is received. Questions about the drawings come to you by email.

  5. Delivery in 3 to 7 business days

    Depending on sheet count and scope. A person reviews every takeoff before it is sent.

Questions from Canadian contractors

How much does a takeoff cost in Canada?

A count takeoff of air devices and equipment starts at $345 CAD for up to 10 sheets, then $28 per sheet. A measured trade takeoff starts at $455 CAD per trade for up to 6 sheets, then $73 per sheet. Pricing with your own rates is from +$275 CAD.

Do you bill in Canadian dollars?

Yes. Canadian clients are quoted and billed in CAD. You can pay by card through a payment link or by Interac e-Transfer.

Is emergency turnaround available?

On request, when capacity allows. The fee is 50% of the takeoff price with a minimum of $210 CAD.

Do you work in metric?

Yes. Quantities follow the units on your drawings, metric or imperial, including airflow in L/s or CFM.

Which provinces do you work in?

Anywhere in Canada. We are based in Ontario and work remotely, so projects in Ontario, Quebec, Alberta, British Columbia and the other provinces are handled the same way.

Do you read spec sections in the old Division 15 numbering?

Yes. Categories are mapped to both MasterFormat Division 23 sections and the older Division 15 numbers that some Canadian specs still use.

How long does a takeoff take?

3 to 7 business days depending on sheet count and scope, counted from when payment is received.

Request a takeoff

Send the drawings and the scope. You get a fixed quote, usually within 1 business day, and nothing starts until you accept it and pay.