Mechanical and MEP Estimating Services
We take off piping, equipment and ductwork from your mechanical drawings, and plumbing, electrical and fire protection for a full MEP bid. Equipment counts start at $245 for up to 10 sheets; measured trades start at $325 per trade for up to 6 sheets.
| Tag | Item | Size | Qty | Checked |
|---|---|---|---|---|
| HWS/R | Heating water supply and return | 2 in | 640 LF | ✓ |
| CHW | Chilled water pipe | 4 in | 380 LF | ✓ |
| GAS | Gas pipe | 1-1/4 in | 215 LF | ✓ |
| REF | Refrigerant line set | 7/8 in | 290 LF | ✓ |
| VLV | Isolation valve | varies | 58 | ✓ |
| P-1 | Circulating pump | sched. | 4 | ✓ |
| B-1 | Boiler | sched. | 2 | ✓ |
What a mechanical takeoff includes
Mechanical scopes can be quoted on their own or together with plumbing, electrical and fire protection for a full MEP bid.
Hydronic piping
Heating water, chilled water and condenser water piping by size and material.
Refrigerant and gas piping
Line sets, gas runs and regulators, measured by size.
Valves and specialties
Isolation, balancing and control valves, strainers, air separators and expansion tanks.
Mechanical equipment
Boilers, chillers, pumps, air handlers and heat exchangers, checked against the schedules.
Fittings and hangers
Elbows, tees, reducers and flanges, plus hangers and supports where they are detailed.
Pipe insulation
Insulation by pipe size and service, following the spec.
Piping takeoffs for mechanical and MEP bids
Mechanical estimating starts with a count you can stand behind. We take off piping, valves and equipment from your mechanical drawings and check every item against the schedules, details and spec sections.
The result is a piping takeoff organized by system and size, with notes on anything the drawings leave open. It drops into your own estimating spreadsheet or software, so your team spends bid week on pricing instead of counting.
Equipment counts with evidence
Mechanical equipment is where a schedule and a set of plans most often disagree. A unit is added in an addendum, a tag is reused on another floor, a pump appears on the plumbing sheets but not the mechanical schedule. Our takeoff engine counts equipment once per tag per floor, compares it with the schedules and marks each line GREEN, YELLOW or RED with the reason. Equipment drawn on plumbing sheets, such as boilers, pumps and tanks, is counted there; HVAC tags repeated on a plumbing sheet are not counted twice. The Evidence sheet lists the sheet, page and location of every counted item, and a person reviews every takeoff before delivery.
Full MEP takeoffs
Mechanical, plumbing, electrical and fire protection can be taken off together and quoted as one job. Each measured trade is priced separately, from $325 per trade for up to 6 sheets, then $52 per sheet, and the counts are priced as a count takeoff. One request, one quote, one delivery date.
Spec sections
Categories are mapped to MasterFormat Division 23 sections and to the older Division 15 numbers, so the takeoff lines up with whichever spec your project uses. Scope notes found on the drawings, such as an addendum referenced, equipment to be replaced or existing work to remain, are listed on their own sheet so you can raise them before bid day.
What to send
The mechanical drawing set as PDFs with schedules and details, the mechanical spec sections and every addendum issued so far. For a full MEP bid, include the plumbing, electrical and fire protection sheets too.
What every count takeoff includes
Mechanical equipment and air devices are counted by our takeoff engine and reviewed by a person. Piping and ductwork are measured in Bluebeam by an estimator.
Excel workbook
Summary, Takeoff, Evidence, By category, Scope flags and Sheet index tabs, ready to paste into your estimate.
Every line by tag
Each line shows the tag, description, schedule quantity, plan count and the final quantity.
Evidence sheet
The sheet, page and location of every counted item, so any number can be checked in seconds.
Schedule vs plan reconciliation
Each line is GREEN when the schedule and the plans agree, YELLOW when they differ a little, RED when they do not match.
Scope flags and open questions
Notes such as an addendum referenced, equipment to be replaced or existing work to remain, worth raising as RFIs before you bid.
Reviewed by a person
The file stays marked DRAFT until every red line has been reviewed. A person reviews every takeoff before delivery.
A PDF summary report comes with the workbook. See a sample takeoff.
Pricing
- Count takeoff (air devices and equipment, for TAB and HVAC): from $245 up to 10 sheets, then $20 per sheet.
- Measured trade takeoff (duct, piping, plumbing, electrical, drywall): from $325 per trade up to 6 sheets, then $52 per sheet.
- Takeoff plus pricing with your own rates: from +$195.
Turnaround is 3 to 7 business days from payment. Emergency turnaround on request when capacity allows: $150 or 50% of the takeoff price, whichever is more.
How it works
Send your drawings
Use the request form or email a link to the set. PDF drawings, schedules, specs and addenda.
We reply with a fixed quote
A fixed price and delivery window for the scope you asked for, usually within 1 business day.
Accept and pay in full
Pay by card payment link, or by Interac e-Transfer in Canada. Payment is in full, before work starts.
Work starts
The clock starts when payment is received. Questions about the drawings come to you by email.
Delivery in 3 to 7 business days
Depending on sheet count and scope. A person reviews every takeoff before it is sent.
Mechanical estimating questions
Is this a full mechanical estimate?
It is the quantity side of the estimate. We deliver the takeoff, and your estimator applies material pricing, labor and markup. If you want a priced sheet, we can apply your own rates as an add-on from +$195.
How much do mechanical estimating services cost?
Equipment and air device counts start at $245 USD for up to 10 sheets, then $20 per sheet. Measured trades such as piping and ductwork start at $325 per trade for up to 6 sheets, then $52 per sheet.
Do you handle full MEP takeoffs?
Yes. Mechanical, plumbing, electrical and fire protection can be taken off together and quoted as one job.
Do you count equipment against the schedules?
Yes. Each tag shows the schedule quantity next to the plan count, with a GREEN, YELLOW or RED status and the reason when they differ.
What kinds of projects do you take on?
Commercial, institutional, industrial and residential work, both new construction and renovation.
What do you need to start?
The mechanical drawing set as PDFs with schedules and details, the mechanical spec sections, and any addenda issued so far.
How long does a mechanical takeoff take?
3 to 7 business days depending on sheet count and scope, counted from when payment is received.
Request a takeoff
Send the drawings and the scope. You get a fixed quote, usually within 1 business day, and nothing starts until you accept it and pay.