Flow State Estimating Request a takeoff

Takeoffs for air balancing (TAB) contractors

We count every grille, register, diffuser, terminal unit and piece of air side equipment on your mechanical plans, then check each count against the schedules. A count takeoff starts at $245 for up to 10 sheets, and every line shows whether the schedule and the drawings agree.

Request a takeoff From $245. Fixed quote first.
Schedule vs plan, sample setSample
TagItemSched.PlansStatus
SD-1Supply diffuser66GREEN
RG-1Return grille33GREEN
EG-1Exhaust grille21YELLOW
VAV-2-04Terminal unitnone1RED
From the sample takeoff, made from a synthetic test set.

Built for test and balance bids

A test and balance bid is priced on the number of outlets, terminals and pieces of equipment you have to read and adjust. Get that count wrong and the bid is wrong. The schedule alone is not enough: the quantity column is often blank, out of date after an addendum, or different from what is actually drawn on the plans.

An air balancing takeoff from Flow State Estimating counts the devices on the plans, puts the schedule quantity next to it and tells you where the two disagree. You get the grille and diffuser count, the terminal units and the equipment list you need for the bid, with the evidence behind every number.

What we count

  • Grilles, registers and diffusers: supply, return, exhaust and transfer, by tag, with the schedule description (type and size) and airflow where it is shown.
  • VAV and terminal units: VAV boxes, fan powered boxes and constant volume terminals, counted per callout.
  • Air side equipment: fans, air handlers, rooftop units, ERVs and HRVs, make-up air units, fan coils and heat pumps, counted once per tag per floor.
  • Untagged outlets: outlets drawn as symbols with an airflow label are picked up where the symbol can be read, and flagged for review.

Balancing point list

The Evidence sheet has one row per located item: tag, sheet, PDF page, position on the page, multiplier, TYP flag and the airflow label when the plans show one. Filter it by tag or by sheet and you have a working point list for the job. Counts are listed by sheet, so you can split them by floor.

Schedule vs drawing conflicts

Every line has a status. GREEN means the schedule and the plan count agree. YELLOW means they differ within a small tolerance, or something needs a spot check, such as a TYP callout with no count. RED means the tag is on the plans but not on any schedule, or the numbers are far apart. The reason is written on the line, so you do not have to work it out.

What every takeoff includes

This is what a count takeoff (air devices and equipment) contains. Measured trades are delivered in Excel by item, size and unit.

  • Excel workbook

    Summary, Takeoff, Evidence, By category, Scope flags and Sheet index tabs, ready to paste into your estimate.

  • Every line by tag

    Each line shows the tag, description, schedule quantity, plan count and the final quantity.

  • Evidence sheet

    The sheet, page and location of every counted item, so any number can be checked in seconds.

  • Schedule vs plan reconciliation

    Each line is GREEN when the schedule and the plans agree, YELLOW when they differ a little, RED when they do not match.

  • Scope flags and open questions

    Notes such as an addendum referenced, equipment to be replaced or existing work to remain, worth raising as RFIs before you bid.

  • Reviewed by a person

    The file stays marked DRAFT until every red line has been reviewed. A person reviews every takeoff before delivery.

A PDF summary report comes with the workbook. See a sample takeoff.

Scope notes that change a TAB price

Some notes on the drawings change what you are bidding even when the device count does not. The takeoff scans the sheets for them and lists each one with the sheet and the text it came from:

  • An addendum is referenced that you may not have.
  • Equipment is to be replaced, or existing ductwork and diffusers are to remain.
  • Pre and post testing is required.
  • Rooms are pressure critical.

These are the questions worth raising as RFIs before bid day. They are listed on the Scope flags sheet in the workbook and in the PDF report.

Formats for your report template

The standard output is an Excel workbook and a PDF summary. If you use your own TAB report template, upload it with the request and the counts are laid out in it, in the order you list outlets, terminals and equipment. Imperial and metric both work: the takeoff follows the units on the drawings, including L/s or CFM.

Who reviews it

Counting is done by our takeoff engine, which reads the drawings without guessing and keeps a record of every item it found. A person then reviews every RED and YELLOW line against the drawings before delivery. The file says DRAFT until that review is done. Your takeoff is prepared by trained professionals with real in-field experience in HVAC and construction.

Pricing

  • Count takeoff (air devices and equipment, for TAB and HVAC): from $245 up to 10 sheets, then $20 per sheet.
  • Takeoff plus pricing with your own rates: from +$195.
  • Firms sending 10 or more jobs a month: monthly plans, ask.

Turnaround is 3 to 7 business days from payment. Emergency turnaround on request when capacity allows: $150 or 50% of the takeoff price, whichever is more.

How it works

  1. Send your drawings

    Use the request form or email a link to the set. PDF drawings, schedules, specs and addenda.

  2. We reply with a fixed quote

    A fixed price and delivery window for the scope you asked for, usually within 1 business day.

  3. Accept and pay in full

    Pay by card payment link, or by Interac e-Transfer in Canada. Payment is in full, before work starts.

  4. Work starts

    The clock starts when payment is received. Questions about the drawings come to you by email.

  5. Delivery in 3 to 7 business days

    Depending on sheet count and scope. A person reviews every takeoff before it is sent.

Air balancing takeoff questions

How do you count grilles for an air balancing bid?

Every supply diffuser, return grille and exhaust grille is located on the mechanical plans by its tag, including multipliers such as (4) SD-1 and TYP callouts. Each one is listed on the Evidence sheet with its sheet, page and location, and the total is compared with the air device schedule.

Do you count the devices or copy the schedule?

We count the devices on the plans. The schedule quantity is shown next to the plan count, and the line is GREEN only when they agree. When they do not, the line is YELLOW or RED with the reason, so you know where to look.

Can you match my report template?

Yes. Upload your template with the request and the counts are laid out in it. Tell us how you list outlets, terminals and equipment and we follow that order.

How much is a TAB takeoff?

A count takeoff of air devices and equipment starts at $245 USD for up to 10 sheets, then $20 per sheet. You get a fixed quote before any work starts.

Do you count VAV boxes and equipment too?

Yes. VAV and terminal units are counted per callout. Air handlers, rooftop units, fans, ERVs, fan coils and heat pumps are counted once per tag per floor, so RTU-1 shown on three sheets is still one unit.

Do you capture airflow for each outlet?

Where the plans show an airflow label next to an outlet, it is captured on the Evidence sheet beside that outlet. Where they do not, the schedule airflow is the reference.

What if the drawings are scanned?

Scanned sheets can be read with OCR, but they are slower and less certain. Any sheet that could not be read cleanly is listed as a warning so it gets checked by hand.

How long does it take?

3 to 7 business days depending on sheet count and scope, counted from when payment is received. Emergency turnaround is available on request when capacity allows.

Request a takeoff

Send the drawings and the scope. You get a fixed quote, usually within 1 business day, and nothing starts until you accept it and pay.